Skip to content

Invite-only beta — UK construction safety

Last job's RAMS, ready for this job in minutes.

For UK construction H&S managers: upload an existing RAMS, Lift Plan, COSHH, Toolbox Talk or HAVS, say what changed for the new site, and get it back on your letterhead, grounded in your rulebook. A first draft for your competent-person review, not a black box.

Ramsly drafts; you remain the competent person. Always review hazards, controls and citations before issuing.

Invite-only · Already have access? Sign in

Structured around the UK regulations principal contractors check against

Every output is a draft a competent person must review and sign before issue.

CDM 2015LOLER 1998PUWER 1998Work at Height Regs 2005Building Safety Act 2022COSHH 2002MHSWR 1999

See it in action

Yesterday's revision, regenerated for today's job

Drop in your last Method Statement, tell Ramsly what changed for the next site visit, and get the regenerated revision back in under 7 minutes. Only the parts your change affects are rewritten.

C03 · Previous revisionUploaded

AGL-AH-XX-XX-MS-X-00022 — Glass Replacement

Acme Glazing Ltd · Project Anchor House, EC4 · Level 14, Bay G-14

2.1 Location: Level 14, Bay G-14 (north elevation)

2.2 Lift Supervisor: J. Walker (NPORS A40)

2.3 Mobile Elevated Work Platform: Genie Z-45/25

2.4 Glass unit: 1850 × 1240mm, IGU 28mm, 78kg

2.5 Exclusion zone radius: 4m below working face

5.3 Sequence: rope-access removal → MEWP refit…

6.1 Hazards: WaH, dropped object, glass breakage…

C04 · Regenerated by Ramsly7 min · grounded

AGL-AH-XX-XX-MS-X-00022 — Glass Replacement

Acme Glazing Ltd · Project Anchor House, EC4 · Level 17, Bay J-17

2.1 Location: Level 17, Bay J-17 (north elevation)

2.2 Lift Supervisor: R. Akande (NPORS A40)

2.3 Mobile Elevated Work Platform: Genie Z-45/25

2.4 Glass unit: 2100 × 1240mm, IGU 32mm, 94kg

2.5 Exclusion zone radius: 5m below working face

5.3 Sequence: rope-access removal → MEWP refit…

6.1 Hazards: WaH, dropped object, glass breakage…

What you told Ramsly

“Same job, but on Level 17 Bay J-17 this time. New unit is 2100 × 1240 (heavier — 94kg). Lift sup is Akande now. Exclusion zone bumped to 5m on the H&S manager's request.”

Ramsly kept your house style, your section structure, your custom controls — and only rewrote the lines your change actually affected. Highlighted lines are what got regenerated.

Mock-up shown — company, project, and personnel are fictional.

How it works

Three steps, one regenerated document

No copy-pasting between Word documents. No find-and-replace on stale templates.

Editing from an uploaded document works across RAMS, Lift Plan, COSHH, TBT and HAVS. Building from scratch is available for RAMS today — the other types are coming soon.

No document to start from? Build a RAMS by chatting with Ramsly — it interviews you one question at a time, reads any drawings you drop in, and hands back a first draft for your competent-person review. Sign in to try the interactive build.

01

Upload

Drag in your existing .docx. We parse the headings and detect every section automatically.

02

Describe

Pick what changed — site, task, equipment, substance — and add a one-line description. That's it.

03

Review & issue

Watch it build section by section, with a safety gate that blocks export while any critical figure is unresolved. Export to Word for sign-off.

Built for the way safety teams actually work

Grounded in your rulebook

Honours your existing document

No template wrangling.

Drop in your last RAMS for the same task. We keep its structure, headings, and any extra sections you've added — and only rewrite what your change actually affects.

Last revision had a custom Section 12 for night-work? It stays.

Grounded in your rulebook

Not a Wikipedia summary.

Every regenerated section is prompted with the exact CDM / LOLER / WaH / PUWER sections that apply to your job type. The rulebook is the source of truth, not the model's prior.

Façade hoist? LOLER 1998 Reg 8 planning bullets fire automatically.

Your letterhead, automatically

No procurement dance.

Domain-based templating — in-house users get their company header bound to their email; external users get a clean blank format. No design-team request, no template upload step.

Your firm's letterhead on every team output, instantly.

Public launch coming

Hear it first when Ramsly opens beyond invite-only.

Not ready to request an invite? Drop your email and we'll tell you the moment we open public signup, plus the occasional product update. No marketing fluff.